Operation Summary for November 30, 2011 - December 2, 2011
 

Wednesday November 30

The day shift began with Operations monitoring Linac, Booster, and Main Injector (MI) accelerators, and with the NuMI, MiniBooNE, and Meson FTBF T-978 experiments taking beam.

During the day shift, at 9:01 AM, a Linac quadrupole power supply (L:QPSC6) tripped off for the first of two trips in 40 minutes; a Linac technician investigated. At 9:06 AM, operators reported the first of two gap fault trips in about an hour on a Booster RF station (BRF16); the station would not reset after the second trip. Operators contacted a Booster RF tech who had the station up and running by 10:22 AM, but at a reduced intensity.

During the evening shift, Operations disabled beam to T-978 at 8:15 PM.

Thursday December 1

The midnight shift began with Operations sending beam to the NuMI and MiniBooNE.

During the midnight shift, operators reported a vacuum burst in the MI-108 area at 12:13 AM; the vacuum recovered and MI resumed sending beam at 12:37 AM. Operations turned off beam to MiniBooNE at 6:38 AM in preparation for air conditioning work at the MI-12 service building. Operations completed a 750 KeV line tune at 6:59 AM. Operations turned off beam to Booster at 7 PM in preparation for an access to repair BRF13. Linac personnel reported at 7:56 AM that they were taking down LRF3 for maintenance.

During the day shift, Booster came out of access at 9:37 AM. Operations established beam to NuMI at 10:07 AM. Operations established beam to T-978 at 10:17 AM. A MI person began a MI-8 line study at 1:54 PM, but this interfered with Booster studies. He ended his study and will complete it on Friday. Operations established beam to MiniBooNE at 3:57 PM.

During the evening shift, operators began a MI tune at 4:16 PM. Operations disabled T-978 beam at 10 PM.

Friday December 2

The midnight shift began with Operations sending beam to the NuMI and MiniBooNE.

During the midnight shift, operators completed a Booster injection tune at 5:55 AM. Operations disabled MiniBooNE beam at 6:01 AM in preparation for an access to complete the air conditioning work at the MI-12 service building. Operations established beam to T-978 at 7:08 AM.

Operations Coordinator (OpsCo) Plans for Today and the Weekend

The OpsCo approved of the plans by Booster, MI, and Muon personnel to conduct studies.

 

Accelerator Update Archive

More Information
For Tevatron luminosity charts and the current status of Fermilab's accelerators and detectors (live!), please go to Fermilab Now.

Comments and Suggestions
What do you think about the Accelerator Updates? Please send comments and suggestions to: accelupdates@fnal.gov.

last modified 12/02/2011    email Fermilab
Security, Privacy, Legal  |  Use of CookiesFermi National Accelerator Laboratory