Operation Summary for October 15, 2010 - October 18, 2010 |
The Integrated Luminosity for the period from 10/11/10 to 10/18/10 was 53.26 pb-1. Friday Oct 15 During the day shift, Operations terminated store 8174 at 8:45 AM, put the TeV into shot setup, and established store 8175 at 10:10 AM with an average initial luminosity (AIL) of 294E30. MI and Pbar personnel conducted antiprotons TLG repetition rate studies. During the evening shift, Operations established beam to the Meson FTBF CALICE experiment T-978 at 3:26 PM and disabled their beam at 10 PM. Operations terminated store 8175 at 10:43 PM, put the TeV into shot setup, and established store 8176 at 11:50 PM with an AIL of 285.66E30. MI and Pbar personnel completed their antiproton studies. Saturday Oct 16 During the midnight shift, Operations reported some minor downtime due to various low-energy Linac RF stations tripping off. Operations established beam to T-978 at 6:30 AM. During the day shift, Operations terminated store 8176 at 1:46 PM, put the TeV into shot setup, and established store 8177 at 3:20 PM with an AIL of 284E30. Operators rebooted a Pbar Accumulator PLC (A:PLC03) due to problems with some transfers to the Recycler. Operations reported some minor downtime when BRF15 tripped off on a modulator LCW flow fault; operators applied a mechanical transient to the flow meter to get the station running again. During the evening shift, Operations disabled the T-978 beam at 6:07 PM. Sunday Oct 17 During the midnight shift, Operations terminated store 8177 at 3:48 AM, put the TeV into shot setup, and established store 8178 at 5:14 AM with an AIL of 284.7E30. Operations established beam to T-978 at 7:28 AM. During the day shift, Operations monitored the machines. During the evening shift, Operations terminated store 8178 at 6:26 PM, put the TeV into shot setup, and established store 8179 at 7:44 PM with an AIL of 293.4E30. Operations disabled the T-978 beam at 6 PM. Monday Oct 18 During the midnight shift, Operations established beam to T-978 at 6:30 AM. Operations reported some minor downtime due to various Linac and Booster trips. The Plans for Monday |
|
More Information Comments and Suggestions |
| last modified 10/18/2010 email Fermilab |
| Security, Privacy, Legal | |