CDF/D0/CD Joint Offline Project FY99 Budget Notes:

This gives guidelines for  acronyms and budget codes for  purchases for the CDF/D0/CD Joint Run II Offline Computing Project.  The goal is to facilitate producing the requisitions and associated justifications and attachments, allow CDF, D0 and CD management the appropriate level of involvement and control of budgeting and purchasing, and to facilitate the tracking and reporting of planned and actual purchases. The Task Coordinators will discuss the proposed budgets with the heads of the CDF and D0 Groups and with each project leader.

Budget

CDF and D0 Groups should propose acronyms, budget codes and budgets to cover the purchases that will be deployed into production in support of the experiments Run II needs.  Acronyms should be of the form CDF-RUN2-XXX and D0-RUN2-XXX. There should  be separate Level 2 acronyms for each category in the Data Needs Assessment Document e.g. FARMS and Analysis Systems.

Joint Offline Projects may need expenditures in the development and testing of their deliverables. In general but not in every case, these expenditures will have acronyms and budget codes assigned to the Department in which the Project Leader resides. In situations where there are 2 Project Leaders both Departments will be involved.. There will be a Level 1 Acronym "RUN2".  Level 2 Acronyms will  identify the Project  e.g. RUN2-DataAccess-TestSystem. I

For purchases where the disposition of costs between the Experiments and the Computing Division is not known at the time of purchase CD level 2 Acronyms and Budget Codes will be assigned under Run2. When the disposition of the purchase costs is known chargebacks or cost/budget code transfers will be made to Experiment or Project specific codes. These will be tracked by the Computing Division Budget Office. e.g. KAI licences.

Maintenance and blanket orders will have a CD Acronym and Budget code. They will be tracked through the CD maintenance group and process - through the ELS group. The acronym should used for such costs will include the string "Run2".
 
Zoom  PAT Visualization  PAT
Simulation  PAT Physics Analysis Tools PAT
SupportDB ODS Data Access and Analysis Hardware CDF D0 ODS OSS HPPC
Configuration Management ODS OSS RIP HPPC DCD
Storage Management and Mass Storage Hardware HPPC Production Management and Production Hardware HPPC OSS
Serial Media Working Group CDF D0 
HPPC OSS
Networking  DCD

Signatures

For FY99 a "Run2 Workflow" will be provided in matrix to allow for signatures by more than one Department Head  where  needed. The Acronym associated with a Requisition will route to the workflow. The required Department level signatures will operate in Parallel - to facilitate multiple signature authorization to provide minimum delay in  the progress of the requisitions.

Reports

Mischief reports will be provided which select all costs associated with Run2 Acronyms and Budget Codes. The Laboratory MMS system has a Project Code "Computing-Run2"  to which all CD Run2 Budget Codes are assigned. Miser will provide reporting according to this list, and will provide ongoing checks that the CD and MMS lists are consistent.