MUCOOL
Muon Ionization Cooling R&D Meeting
November 20000
09:00 - 09:10 Introduction Steve Geer
09:10 - 09:30 Channel simulation update Paul Lebrun
- guidelines for RF parameters, Talk
solenoids, & LH2 absorbers
RF Session
09:30 - 09:50 Lab G Status Al Moretti
09:50 - 10:10 805 MHz open cell cavity Tom Jurgens
Talk
10:10 - 10:30 805 MHz cavity development, Derun Li
200 MHz design at LBNL Talk
10:30 - 10:50 Coffee
10:50 - 11:10 Be window designs and issues Derun Li
Talk
11:10 - 11:40 200 MHz high power test setup Milorad Popovic
plans
11:40 - 12:10 200 MHz cavity design at FNAL Al Moretti
and R&D plan
12:10 - 12:30 Discussion
12:30 - 13:30 Lunch
LH2 Absorber session
13:30 - 14:00 Window R&D and absorber design Dan Kaplan
Talk
14:00 - 14:30 Absorber design and construction Ed Black
plans Talk
14:30 - 15:00 Window/absorber Aactivities and Don Summers
plans at Mississippi
15:00 - 15:30 LH2 Test facility Mary-Anne Cummings
15:30 - 15:50 Coffee break
15:50 - 16:05 Absorber activities at KEK Yoshi Kuno
Talk-p1 p2 p3 p4 p5 p6 p7 p8 p9
16:05 - 16:20 Bench test and beam test plans Mary-Anne Cummings
16:20 - 16:30 Discussion
Muon Beam Test Session
16:30 - 16:45 Concepts Steve Geer
Talk
16:45 - 16:55 Comparison of MUSCAT results Yasuo Fukui
with ICOOL
16:55 - 17:25 Beamline design & Ring ideas Valerie Balbekov
Talk
17:25 - 17:55 Test setup simulations / plans Rajendran Raja
17:55 - 18:15 Discussion
Last updated Nov, 2000
Suggestions ? Contact sgeer@fnal.gov