All Experimenters Meetings
Special Reports

T-972 Radiation Shielding and Effects - Yoshimi Kasugai, August 25, 2008 (PPT)

First Direct SM Higgs Mass Exclusion at the Tevatron - Darien Wood, August 4, 2008 (PPT)

CMS Installation and Commissioning - Ingo Bloch, August 4, 2008 (PDF)

COUPP - Andrew Sonnenschein, July 21, 2008 (PDF)

Psec-Resolution Time-of-Flight Detectors - Camden Ertley, July 14, 2008 (PPT)

CDMS Progress and Plans - Dan Bauer, July 7, 2008 (PDF)

MI Proton Scraping and Tevatron Luminosity - Mike Syphers, June 23, 2008 (PDF)

Antiproton Production Targets - Keith Gollwitzer, June 16, 2008 (PPT)

Dark Energy Survey - Brenna Flaugher, June 16, 2008 (PPT)

CMS Installation and Commissioning - Dave Mason, June 2, 2008 (PDF)

Tevatron Orbit Stabilization - Dean Still, June 2, 2008 (PPT)

CALICE at FNAL-MTBF - Georgios Mavromanolakis, May 19, 2008 (PDF)

Beam Measurements at the Meson Test Beam Facility - Erik Ramberg, May 19, 2008 (PPT)

Recent Antiproton Source Operations - Keith Gollwitzer, May 5, 2008 (PPT)

Big Things Happening in MTest - Doug Jensen, May 5, 2008 (PPT)

Rapid Transfer Progress and Plans - Cons Gattuso, April 28, 2008 (PPT)

Blowing Up PBar Emittances - Mike Syphers, April 28, 2008 (PDF)

MI Collimation System - Bruce Brown, April 14, 2008 (PPT)

FCC Water Leak / FNALU - Jack Schmidt, April 14, 2008 (PPT)

MuCool RF Program - Alan Bross, March 31, 2008 (PPT)

RF Spoke Cavity Tests, Part II - Timergali Khabiboulline, March 31, 2008 (PDF)

Antiproton Lens Replacement, Part II - Keith Gollwitzer, March 10, 2008 (PPT)

Switchyard 120/MTest Beam Upgrades - Rick Coleman, March 10, 2008 (PPT)

Antiproton Lens Replacement - Keith Gollwitzer, March 3, 2008 (PPT)

Lifetime of the CDF Silicon Detectors Using Bias-Scan Data - Oscar Gonzales, February 25, 2008 (PDF)

Correction of the Tevatron Collision Optics - Alex Valishev, February 18, 2008 (PPT)

CMS Installation and Commissioning - Lenny Spiegel, February 11, 2008 (PDF)

COUPP Status in the MINOS Hall - Erik Ramberg, February 4, 2008 (PPT)

Rapid Transfers to the Recycler Ring - Cons Gattuso, January 28, 2008 (PPT)

11-Batch Main Injector Operation - Kiyomi Seiya, January 28, 2008 (PPT)

Computing Division Near-Miss Water Leak - Adam Walters, January 7, 2008 (PDF)

Modifications to Tevatron Shot Setup - Cons Gattuso, January 7, 2008 (PPT)

CMS Global Run Experience - Kaori Maeshima, December 17, 2007 (PDF)

Tevatron Operations Since the Shutdown - Ron Moore, December 17, 2007 (PPT)

Antiproton Production Since the Shutdown - Keith Gollwitzer, December 10, 2007 (PPT)

CMS's CSA07 Data Challenge - Ian Fisk, December 3, 2007 (PDF)

Status of the CMS Forward Pixel Detector - Simon Kwan, November 26, 2007 (PDF)

CMS Installation and Commissioning - Kaori Maeshima, November 12, 2007 (PDF)

CDF ISL Cooling Leak: Cause and Mitigation - Jose Enrique Garcia, November 5, 2007 (PPT)

High Power Tests of Novel Fast Phase Amplitude Modulators for HINS - Robyn Madrak, October 29, 2007 (PPTM)

New Muon Lab SCRF Test Facility - Sergei Nagaitsev, October 15, 2007 (PPT)

Low Energy Test Beam Particle ID and Rates - Erik Ramberg, October 15, 2007 (PPT)

CDF ISL Cooling: Leak Repair - Ken Schultz, October 15, 2007 (PPT)

LARP Magnet Progress - Mike Lamm, October 8, 2007 (PPT)

Status of PEANUT - Gina Rameika, October 8, 2007 (PDF)

GammeV (T-969) Update - Jason Steffen, October 1, 2007 (PDF)

HINS Room Temperature RF Cavity Test Milestone - Gennady Romanov, October 1, 2007 (PDF)

ILC Vertical Cavity Test Facility - Camille Ginsburg, September 10, 2007 (PPT)

New Run of COUPP T945 - Mike Crisler, September 10, 2007 (PPT)

MI Group Collimation Efforts - Bruce Brown, July 23, 2007 (PPT)

NuMI Horn Water Cooling - Past Failures and Future Fixes - Kris Anderson, July 16, 2007 (PPT)

Recent Tevatron Operations - Ron Moore, July 9, 2007 (PPT)

CDF ISL Cooling Update - Peter Wilson, July 2, 2007 (PDF)

T-958/LHC Forward Proton Fast Timing Test - Andrew Brandt, July 2, 2007 (PDF)

Linac Beam Stability and Modulation – Doug Moehs, June 25, 2007 (PPT)

ILC Horizontal Cavity Test Stand at MDB – Andy Hocker, June 25, 2007 (PPT)

Antiproton Source Status - Keith Gollwitzer, June 18, 2007 (PPT)

3.9 GHz Superconducting RF Cavities - Elvin Harms, June 4, 2007 (PPT)

GammeV/T-969 Installation and Commissioning - William Wester, June 4, 2007 (PDF)

SciBooNE Installation - Rick Tesarek, June 4, 2007 (PDF)

CDF ISL Cooling - Peter Wilson, May 21, 2007 (PDF)

Proton Source Update and Plans - Bill Pellico, May 21, 2007 (PPT)

Cryomodule Assembly Facility (CAF) for SRF R&D at Fermilab - Tug Arkan, May 14, 2007 (PDF)

Main Injector High Intensity Operation - Ioanis Kourbanis, April 30, 2007 (PPT)

ILC Beam Instrumentation - Manfred Wendt, April 23, 2007 (PPT)

CDMS Operations and Prospects - Dan Bauer, April 23, 2007 (PDF) (PPT)

SciBooNE Detector Move to Enclosure - Rick Tesarek, April 16, 2007 (PDF)

Tevatron Sextupole System Modifications - Jerry Annala, April 16, 2007 (PPT)

Upgraded Meson Test Beam - Erik Ramberg, April 16, 2007 (PPT)

Improvements to Pbar Mining in the Recycler - Chandra Bhat, April 9, 2007 (PPT)

SciBooNE Detector Move to Enclosure - Rick Tesarek, April 9, 2007 (PDF)

LHC Inner Triplet Status - Steve Holmes, April 2, 2007 (PDF)

CDF Run IIb Bandwidth Upgrades - Frank Chlebana, April 2, 2007 (PDF)

Stack-tail Improvements: Present and Planned - Valeri Lebedev, April 2, 2007 (PDF)

CDF Silicon Cooling - Mary Convery, March 19, 2007 (PDF)

Completion of US LHC Accelerator Project - Jim Kerby, March 19, 2007 (PPT)

Sloan Survey II (E-949) Status and Future Plans - Steve Kent, March 12, 2007 (PDF)

Modeling of the Booster Beam - Yang Xi, March 12, 2007 (PDF)

Auger Observatory Update - Aaron Chou, March 5, 2007 (PPT)

Commissioning the Low Energy Test Beam - Chuck Brown, March 5, 2007 (PPT)

Adaptive RF Correction in the Recycler - Nathan Eddy, February 26, 2007 (PPT)

Streamlining CDF Shift Operations - Peter Wilson, February 26, 2007 (PPT)

LEMC Workshop Highlights & 6D Muon Cooling Experiment - Andreas Jansson, February 19, 2007 (PPT)

Multi-Batch Slip Stacking for NuMI - Kiyomi Seiya, February 12, 2007 (PPT)

LHC@FNAL Remote Operations Center - Eric Gottschalk, February 5, 2007 (PPT)

Next Fill of COUPP Bubble Chamber - Andrew Sonnenschein, February 5, 2007 (PDF)

Transferring Magnetic Storage Media Off-Site - Mark Leininger, February 5, 2007 (PPT)

New Pbar Cogging in the Tevatron - Ron Moore, January 29, 2007 (PPT)

Recent Antiproton Source Operations - Keith Gollwitzer, January 29, 2007 (PPT)

Tevatron Separator Spark History - Ron Moore, January 22, 2007 (PPT)

MI-8 Collimator Study - Bruce Brown, January 22, 2007 (PPT)

First Demonstration of Beam-Beam Compensation in the Tevatron - Seva Kamerdzhiev, January 8, 2007 (PPT)

Wireless Network Name Change - Donna Lamore, January 8, 2007 (PDF)

Rapid Transfers to the Recycler - Cons Gattuso, December 18, 2006 (PDF)

T-959 Microparticle Shielding Test in M02 - Kim Burns, December 18, 2006 (PDF)

Meson Test Beam Upgrade - Rick Coleman, December 11, 2006 (PPT)

SciBooNE Construction Progress - Morgan Wascko, December 4, 2006 (PDF)

Tevatron Low-Beta Optics Measurements and Upgrade Plans - Alexander Valishev, December 4, 2006 (PDF)

Wireless Network Name Change - Mark Leininger, December 4, 2006 (PDF)

Multi-Batch Slip-Stacking for NuMI - Kiyomi Seiya, November 20, 2006 (PDF)

Sending Storage Media Off-site - Mark Leininger, November 6, 2006 (PDF)

Booster Activities - Eric Prebys, November 6, 2006 (PDF)

Accelerator Controls Migration - Peter Kasper, October 30, 2006 (PDF)

Recent Improvements in Antiproton Stacking - Valeri Lebedev, October 23, 2006 (PDF)

Tevatron Operations Since the Shutdown - Ron Moore, October 16, 2006 (PDF)

DZero Luminosity - Brendan Casey, October 9, 2006 (PDF)

Tevatron Ionization Profile Monitor - Andreas Jansson, September 25, 2006 (PDF)

Observation of the b Baryon Sigma-b - Dmitry Litvintsev, September 25, 2006 (PDF)

Meson Test Beam Upgrade - Rick Coleman, September 18, 2006 (PDF)

LHC@FNAL - Elvin Harms, September 18, 2006 (PDF)

Zebra Mussel Control - Anne Lucietto, September 18, 2006 (PDF)

Start of SciBooNE Civil Construction - Rick Tesarek, September 11, 2006 (PDF)

COUPP Bubble Chamber Test - Mike Crisler, September 11, 2006 (PDF)

Tevatron Electron Lens (TEL-2) - Seva Kamerdzhiev, August 28, 2006 (PDF)

Meson Roof Repair - Elaine McCluskey, August 28, 2006 (PDF)

CMS Pixels in Test Beam - Lorenzo Uplegger, August 21, 2006 (PDF)

CDMS II: Back in Operation - Dan Bauer, July 10, 2006 (PDF)

Capture Cavity II Update - Tim Koeth, July 10, 2006 (PDF)

Recycler Performance Improvements - Martin Hu, July 10, 2006 (PDF)

Water Quality Task Force Report - Steve Holmes, June 5, 2006 (PDF)

High Pressure MuCool RF Cavities in B Field - Pierrick Hanlet, May 22, 2006 (PDF)

Zebra Mussel Abatement - Anne Lucietto, May 22, 2006 (PDF)

Recent Activity at the Test Beam - Erik Ramberg, May 1, 2006 (PDF)

NuMI Horn Repair - Jim Hylen, May 1, 2006 (PDF)

Capture Cavity II in Meson - Tim Koeth, April 3, 2006 (PDF)

NuMI Horn Repair - Jim Hylen, April 3, 2006 (PDF)

MI Beam Position Monitor Upgrade - Rob Kutschke, April 3, 2006 (PDF)

COUPP Bubble Chamber Test - Andrew Sonnenschein, April 3, 2006 (PDF)

HFM / LARP Magnet R&D - Giorgio Ambrosio, March 6, 2006 (PDF)

Retiring Off-Site Legacy Magnetic Tapes - Peter Cooper, March 6, 2006 (PDF)

Liquid Argon R&D Effort at Fermilab - Petros Rapidis, February 27, 2006 (PDF)

ICW Shutdown Flushing Plan - Vic Kuchler, February 20, 2006 (PDF)

MiniBooNE Neutrinos at MINOS - Simona Murgia, February 13, 2006 (PDF)

ALARA and AEM Schedule during Shutdown - Jeff Appel, February 13, 2006 (PDF)

Niobium for SRF Cavities - Pierre Bauer, February 13, 2006 (PDF)

CDF Upgrade Completion - Pat Lukens, January 23, 2006 (PDF)

AP2 Line and Debuncher Studies Status - Keith Gollwitzer, January 9, 2006 (PDF)

Proton Source Shutdown Work Summary - Eric Prebys, December 12, 2005 (PDF)

Computing Service Interruptions - Bob Tschirhart, December 5, 2005 (PDF)

ANL/FNAL SC Surface Processing Facility - Allan Rowe, December 5, 2005 (PDF)

Events Leading to Failure of B17 Spool - Ron Moore, November 28, 2005 (PDF)

Meson Test Beam Use - Erik Ramberg, November 28, 2005 (PDF)

December Accelerator Studies - Dave McGinnis, November 21, 2005 (PDF)

Recent Progress on ILC Test Area - Paul Czarapata, November 14, 2005 (PDF)

Recycler Operations - Cons Gattuso, November 7, 2005 (PDF)

Recent Tevatron Efforts - Ron Moore, October 31, 2005 (PDF)

Tevaron Crystal Collimation - Dean Still, October 24, 2005 (PDF)

Tevaron Orbit Stabilization - Vahid Ranjbar, October 10, 2005 (PDF)

NuMI Horn Ground Fault Update - Craig Moore, October 10, 2005 (PDF)

NuMI Horn Ground Fault - Craig Moore, October 3, 2005 (PDF)

Water Management on Site - Vic Kuchler, September 19, 2005 (PDF)

Luminosity Task Force - Vaia Papadimitriou, September 12, 2005 (PDF)

New Optics for the Tevatron - Alexander Valishev, August 29, 2005 (PDF)

DZero Silicon Radiation Damage So Far - Sergey Burdin, August 8, 2005 (PPT)

CDF Silicon Radiation Damage So Far - Antonio Boveia, August 1, 2005 (PDF)

Electron Cooling Demonstration with Recycler 8.9-GeV/c pbars - Sergei Nagaitsev, July 18, 2005 (PDF)

Tevatron Tune Tracker - Cheng-Yang Tan, June 27, 2005 (PDF)

Summary of Work Done on SY120 and HPTF in June 2005 - Brajesh Choudhary, June 20, 2005 (PDF)

Progress and Plans for Rapid Transfers - Elvin Harms, June 20, 2005 (PDF)

Beam-Beam Effects: Now and After Upgrades - Vladimir Shiltsev, June 13, 2005 (PDF)

PBar Source Diagnostics - Bill Ashmanskas, June 6, 2005 (PDF)

New Booster Injection Scheme - Eric Prebys, May 23, 2005 (PDF)

MTA and Muons Inc. Experiment - Pierrick Hanlet, May 9, 2005 (PDF)

Increasing the AP2 & Debuncher Aperture - Keith Gollwitzer, May 9, 2005 (PDF)

NuMI Target Update - Dixon Bogert, May 2, 2005 (PDF)

Beam Loss Monitor Upgrade - Jonathan Lewis, May 2, 2005 (PDF)

Electrostatic Separator R&D - Oleg Prokofiev, April 25, 2005 (PDF)

NuMI Target Update - Dixon Bogert, April 25, 2005 (PDF)

NuMI Target Update - Dixon Bogert, April 18, 2005 (PDF)

NuMI Target Update - Dixon Bogert, April 11, 2005 (PDF)

US-LHC Accelerator Project at Fermilab - Jim Kerby, April 11, 2005 (PDF)

NuMI Target Update - Dixon Bogert, April 4, 2005 (PDF)

Visitor Access to PPAs Including CDF and DZero - Bruce Chrisman, April 4, 2005 (PDF)

Tevatron Helices and Lifetimes - Ron Moore, April 4, 2005 (PDF)

Electron Cooling Commissioning - Sergei Nagaitsev, April 4, 2005 (PDF)

Slip Stacking - Kiyomi Seiya, March 28, 2005 (PDF)

CDF Silicon Detector Damage Update - Marcel Stanitzki, March 21, 2005 (PDF)

D0 Luminosity Measurement - Brendan Casey, March 21, 2005 (PDF)

Computer Security - Mark Leininger, March 7, 2005 (PDF)

SMTF on the Ground - Peter Limon, February 28, 2005 (PDF)

7835 Power Tubes in the Fermilab Linac - Elliott McCrory, February 21, 2005 (html)

Superconducting RF Module & Test Facility - Shekhar Mishra, February 14, 2005 (PDF)

Fermilab Power Distribution System - Vic Kuchler, February 7, 2005 (PDF)

Internal Rolls in Tevatron Dipoles - Phil Schlabach, January 31, 2005 (PDF)

First Neutrino Events to MINOS Near Detector - Nancy Grossman, January 24, 2005 (PDF)

Tevatron BPM Upgrade - Steve Wolbers, January 24, 2005 (PDF)

Site Access - Bill Griffing, January 10, 2005 (PDF)

Snow Removal - Vic Kuchler, January 10, 2005 (PDF)

NuMI Beamline Instrumentation - Sacha Kopp, January 3, 2005 (PDF)

MINOS Near Detector Commissioning - Peter Shanahan, December 13, 2004 (PDF)

Initial NuMI Beam Startup - Sam Childress, December 6, 2004 (PDF)

Momentum Mining in the Recycler - Chandra Bhat, November 22, 2004 (PDF)

Startup Plans - Dave McGinnis, November 15, 2004 (PDF)

Main Injector Achievements in FY04 - Ioanis Kourbanis, November 8, 2004 (PDF)

Neutron Therapy Facility - Arlene Lennox, October 25, 2004 (PDF)

Electron Cooling Installation - Sergei Nagaitsev, October 11, 2004 (PDF)

D0 Luminosity - Brendan Casey, September 27, 2004 (PDF)

NuMI/MINOS Status - Rob Plunkett, September 13, 2004 (PDF)

Status of the MiniBooNE Horn - Ioanis Kourbanis, August 2, 2004 (PDF)

RICE Testbeam Results - Alice Bean, July 12, 2004 (PDF)

Experimenter Contributions to Main Injector Improvements - Alberto Marchionni, June 21, 2004 (PDF)

Experimenter Contributions to Booster Improvements - Eric Prebys, June 14, 2004 (PPT)

CDF Central Outer Tracker Status Report - Morris Binkley, June 14, 2004 (PDF)

Critical Feeder Replacement Project - David Nevin, May 24, 2004 (PDF)

Booster Radiation Levels - Peter Kasper, May 17, 2004 (PDF)

Fermilab/NICADD Photoinjector Lab - Philippe Piot, May 17, 2004 (PDF)

2.5 MHz Pbar Transfers in MI - Ioanis Kourbanis, May 10, 2004 (PDF)

Superconducting Cavity Development - Leo Bellantoni, May 3, 2004 (PDF)

TevNet - Bob Bernstein, April 26, 2004 (PDF)

Beam Spot Measurements at D0 - Gaston Gutierrez, April 12, 2004 (PDF)

Shot Data Analysis - Jean Slaughter, April 5, 2004 (PDF)

High Field Magnet Development - Alex Zlobin, March 22, 2004 (PDF)

Proton Planning - Eric Prebys, March 15, 2004 (PDF)

NuMI/MINOS Downstream Installation - Cat James, March 8, 2004 (PDF)

Dynamic Effects in Tevatron Dipoles - Pierre Bauer, March 1, 2004 (PDF)

SY120 Status - Chuck Brown, February 23, 2004 (PDF)

MINOS Installation Schedule - Gina Rameika, February 23, 2004 (PDF)

Tevatron Magnet Reshimming - Dave Harding, February 9, 2004 (PDF)

A0 Abort System Power - Paul Czarapata, February 9, 2004 (PDF)

Linear Collider at Fermilab - Shekhar Mishra, February 2, 2004 (PDF)

Tevatron Abort Task Force - Paul Czarapata, January 5, 2004 (PDF)

16-House Quench Analysis - Dean Still, January 5, 2004 (PDF)

Auger Project - Aaron Chou, December 15, 2003 (PDF)

NuMI Beam Design - Jim Hylen, December 8, 2003 (PDF)

US LHC Accelerator Project - Jim Strait, November 24, 2003 (PDF)

MINOS Near Detector Status - Peter Shanahan, November 17, 2003 (PDF)

US CMS Status - Theresa Shaw, November 10, 2003 (PDF)

MINOS Far Detector Operations - Sergei Avvakumov, November 3, 2003 (PDF)

Sloan Digital Sky Survey (SDSS – E885) Steve Kent, October 20, 2003 (PDF)

NuMI/Minos Introduction – Robert Plunkett, October 6, 2003 (PDF)

Cryogenic Dark Matter Search (CDMS) – Dan Bauer, October 6, 2003 (PDF)

MIPP (E907) Installation - Rajendran Raja, August 25, 2003 (PDF)

Progress on SY120 - Tom Kobilarcik, August 18, 2003 (PDF)

Accelerator Study Strategy - Dave McGinnis, August 18, 2003 (PDF)

Summer 2003 Shutdown: Revised Dates - Jeff Appel, July 28, 2003 (PDF)

Summer 2003 Shutdown Plan - Jeff Appel, June 2, 2003 (PDF)

Tevatron Injection Helix - Mike Martens, May 19, 2003 (PDF)

SY 120 Commissioning Plan - Craig Moore, April 28, 2003 (PDF)

SY 120 Test Beam Commissioning - Craig Moore, April 28, 2003 (PDF)

Tevatron Orbit Smoothing - Mike Martens, April 28, 2003 (PDF)

The Proton Source Committee - Dave Finley, April 7, 2003 (PDF)

Computer Security Update - Dane Skow, February 24, 2003 (PDF)

Alignment Group Report - Robert Bernstein, February 10, 2003 (PDF)

Back to Program Planning Office


jackiec@fnal.gov