LBNE Reconfiguration
Fermilab:
Skip over navigation to main content
Home
Help
Press Room
Phone Book
Fermilab at Work
Skip over navigation to main content
LBNE Reconfiguration
Organization
Steering Committee
Steering Committee
Steering Committee Meetings
Physics Working Group
Physics Working Group
Physics Working Group Minutes
Engineering/Cost Working Group
Engineering/Cost Working Group
Engineering/Cost Working Group Minutes
March 19, 2012 Charge letter from Brinkman to Oddone
Workshop
(April 25-26, 2012)
Community Voice
Interim Report
(June 5, 2012)
June 29, 2012 letter from Brinkman in response to the Interim Report
Input to the European Strategy Group
LBNE Reconfiguration Report
Steering Committee Report (PDF) — August 6, 2012
Supporting Documents
Physics Working Group Report (PDF)
Engineering / Cost Working Group Report (PDF)
Muon-induced background for beam neutrinos at the surface (PDF)
Can the NuMI beam-line be further optimized for a lower-neutrino-energy spectrum? (PDF)
The Science and Strategy for a Long-Baseline Neurtino Experiment Near Detector (PDF)
Physics Opportunities with Stage 1 of Project X (PDF)
Relevant Reports
Marx/Reichanadter Report (May 2011)
DUSEL Science NRC Report (July 2011)
Intensity Frontier Report (May 2012)
More ways to follow us
Home Page
HEP Program
News & Information
Particle Physics News
Image Bank
Fermilab in the News
Quantum Diaries
Travel and Lodging
Directions to Fermilab
Local Accommodations
Map of Local Hotels
Transportation and Accommodations
Visa Information
Wifi Access at Fermilab
Other Useful Links
Last modified: 04/25/2012