Well in advance of anticipated test beam use, submit to the Program Planning Office a written request with the following information:
Physicists and institutions involved in the study, and the name of the spokesperson
Description of the detector to be studied and the purpose of the study
Physical layout of the detector and associated equipment
Beam requirements, including an estimate of the beam time needed
Data Acquisition System and other electronics to be used, and computing needs
Financial arrangements
Hazardous materials involved, if any
Length of time the experimental area will be occupied
Other special conditions
Appropriate members of the laboratory staff study the document to determine feasibility of such a test. Then the spokesperson or designee prepares an MOU to the laboratory directorate for review and authorization.